Chongqing Changhe Expressway
TIME:2019-06-17   READER:353







The length of the Changhe Expressway is 77 kilometers, and the estimated investment is about 10.8 billion yuan. It adopts the BOT+EPC project management mode and has a design speed of 80 kilometers per hour and two lanes. The project starts from Hechuan Shaxi Interchange and connects three districts of Hechuan, Beibei and Yubei in Chongqing. It stops near Jianshui Bay in the Changchun Expressway and connects with the expressway of Nanchuan to Liangjiang New District and the Longchang Expressway. The project has 12 interchanges, 16890.5m/44 bridges, 18411.1m/10 tunnels, and 46.4% bridges and tunnels.

Previous:none

Copyright: Shanxi Jiawei New Materials Co., Ltd. Record number: Jin ICP preparation *****