
![]() |
![]() |
|
|
![]() |
![]() |
The length of the Changhe Expressway is 77 kilometers,
and the estimated investment is about 10.8 billion yuan. It adopts the BOT+EPC
project management mode and has a design speed of 80 kilometers per hour and
two lanes. The project starts from Hechuan Shaxi Interchange and connects three
districts of Hechuan, Beibei and Yubei in Chongqing. It stops near Jianshui Bay
in the Changchun Expressway and connects with the expressway of Nanchuan to
Liangjiang New District and the Longchang Expressway. The project has 12
interchanges, 16890.5m/44 bridges, 18411.1m/10 tunnels, and 46.4% bridges and
tunnels.